Sartorius Plant -2001-

It was planned to extend the production plant of the Sartorius factory located in Goettingen.

Projectdata

Client / Building Owner Sartorius AG - Mr. Margraf
Architect Koppenhoefer und Partner GmbH
Time of performance / construction period 1999, 2000 - 2001
Asset groups Heating, Ventilation, Air-Conditioning, Sanitary Facilities, Electro-Technics, Power System for Information Technology, BMS
Project Details

Plans had been made to extend the production plant of the Sartorius factory located in Goettingen. Being a supplier of membrane products, a production and packing plant with an area of about 10.000m2 was planned. Additionally, a storage for semi-finished goods with an area of 800m2 including an explosion prevention system with fire detection and water spray deluge system was intended. Plans also included a building housing offices and laboratories with a total area of 2.200m2, and a multipurpose building of 700m2. The production plant has clean rooms of D and C standard according to GMP requirements; certain areas were constructed according to B standards.