New Logistics Center Biberach (ZLB)

In order to centralize the logistics of the Boehringer Ingelheim Company located in Biberach on the Riß, a new building on the northern part of the compound was constructed.

Projectdata

Client / Building Owner Boehringer Ingelheim Pharma GmbH & Co. KG - Mr. Zweil
Architect gruoner+partner
Time of performance / construction period 2007, 2008 (Completed)
Asset groups Sanitary Facilities, Heating, Air-Conditioning, Ventilation, Sprinkler Systems, Measurement and Control System
Phases of Construction LP5 – LP8
GFA ca. 10.000m²
Project Details

In order to centralize the logistics of the Boehringer Ingelheim Company, located in Biberach on the Riß, a new building on the northern part of the compound was constructed. According to its different functions, the complex of buildings is divided into three main parts.

The three-story building (GFA: ca. 7.800m2) houses areas of order picking of incoming and outgoing articles, space for examining the quality of samples, room for technical installations, cold and refrigeration storage to keep temperatures of substances on a low level (down to -40°C).

A big part of the project is concerned with the construction of a cold storage having a height of 18m on a total area of 300m2 and room for 700 pallets in which temperature- sensitive substances can be stored at 2 to -8°C.

The third part of the building (GFA ca. 2.450m2) has four floors on which offices, meeting rooms, staff and training course rooms are located. The complex of buildings meets international GMP requirements.